{"id":7517,"date":"2020-06-18T14:48:21","date_gmt":"2020-06-18T04:48:21","guid":{"rendered":"http:\/\/mascotengineering.com\/?post_type=case_study&#038;p=7517"},"modified":"2021-03-10T14:15:58","modified_gmt":"2021-03-10T03:15:58","slug":"central-station-psu-upgrade","status":"publish","type":"case_study","link":"https:\/\/mascotengineering.com\/sg\/case-study\/central-station-psu-upgrade\/","title":{"rendered":"Central Station PSU Upgrade"},"content":{"rendered":"<p>Measuring a huge 6m by 4m and just under 3m in depth, this large custom precast cable pit was quite a sight on the streets of the CBD.<\/p>\n<p>The <a href=\"http:\/\/mascotengineering.com\/sg\/products\/custom-concrete\/\">custom concrete pit<\/a> was manufactured to Novo Rail and Transport for NSW project specific requirements complete with retractable ladders for easy access and cast in drainage sump in the floor.\u00a0 A Class D multipart access cover complete with removable beams to allow for a full clear opening using Mascot Access Covers was cast into the pit in one pour to ensure product integrity.<\/p>\n<p>Transported out of hours with accompanying pilot vehicles front and rear due to oversize travel restrictions, the big pit travelled on a pre-planned RMS approved route.\u00a0 The transport and arrival timing was coordinated with the onsite cranes installation schedule to minimise the impact to surrounding residents and businesses.<\/p>\n<p>The pit included certified and tested lifting points to ensure the crane lift and install went smoothly\u2026 it drew quite a crowd for 2am on a Sunday.\u00a0 This <a href=\"http:\/\/mascotengineering.com\/sg\/products\/coreworx-jointbays\/joint-bays\/\">33Kv feeder pit<\/a> is part of the Sydney Trains power supply infrastructure upgrade from Surry Hills to Central Station \u2013 more power will allow them to offer more services.\u00a0 Below you\u2019ll find a link to a video produced by Transport for NSW explaining the project whilst featuring our pit being installed (between 12 and 17 seconds).<\/p>\n<p>https:\/\/www.facebook.com\/TransportForNSW\/videos\/2907185082893370\/<\/p>\n<p>&nbsp;<\/p>\n<p>We understand that it\u2019s not just a product solution our clients are seeking when they engage Mascot Engineering to supply custom precast concrete products for critical infrastructure projects.\u00a0 We work with our clients from design stage, through engineering, approvals, manufacture (with project specific ITP) to delivery and QA documentation.\u00a0 Our clients rely on us to perform and deliver to meet their construction schedule and we\u2019re proud of the partnerships we have with our increasing loyal and repeat customers.<\/p>\n<p>For more information, follow the links below.<\/p>\n<p><a href=\"http:\/\/mascotengineering.com\/sg\/products\/custom-concrete\/\">Custom Concrete<\/a><br \/>\n<a href=\"http:\/\/mascotengineering.com\/wp-content\/uploads\/2020\/04\/Capability-Statement.pdf\">Capability Statement<\/a><br \/>\n<a href=\"http:\/\/mascotengineering.com\/sg\/products\/coreworx-jointbays\/\">Coreworx<\/a><br \/>\n<a href=\"http:\/\/mascotengineering.com\/sg\/about\/australian-made\/\">Australian Made<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Measuring a huge 6m by 4m and just under 3m in depth, this large custom precast cable pit was quite a sight on the streets of the CBD. The custom concrete pit was manufactured to Novo Rail and Transport for NSW project specific requirements complete with retractable ladders for easy access and cast in drainage [&hellip;]<\/p>","protected":false},"featured_media":7520,"template":"","sector":[49,46],"product":[59,65],"class_list":["post-7517","case_study","type-case_study","status-publish","has-post-thumbnail","hentry","sector-civil-infrastructure","sector-energy-utilities","product-cable-pits","product-custom-concrete"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Central Station PSU Upgrade | Mascot Engineering<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mascotengineering.com\/sg\/case-study\/central-station-psu-upgrade\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Central Station PSU Upgrade | Mascot Engineering\" \/>\n<meta property=\"og:description\" content=\"Measuring a huge 6m by 4m and just under 3m in depth, this large custom precast cable pit was quite a sight on the streets of the CBD. The custom concrete pit was manufactured to Novo Rail and Transport for NSW project specific requirements complete with retractable ladders for easy access and cast in drainage [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mascotengineering.com\/sg\/case-study\/central-station-psu-upgrade\/\" \/>\n<meta property=\"og:site_name\" content=\"Mascot Engineering\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/MascotEngineering\" \/>\n<meta property=\"article:modified_time\" content=\"2021-03-10T03:15:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mascotengineering.com\/wp-content\/uploads\/2020\/06\/IMG_2859a.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"750\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/mascotengineering.com\/case-study\/central-station-psu-upgrade\/\",\"url\":\"https:\/\/mascotengineering.com\/case-study\/central-station-psu-upgrade\/\",\"name\":\"Central Station PSU Upgrade | Mascot Engineering\",\"isPartOf\":{\"@id\":\"https:\/\/mascotengineering.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/mascotengineering.com\/case-study\/central-station-psu-upgrade\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/mascotengineering.com\/case-study\/central-station-psu-upgrade\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/mascotengineering.com\/wp-content\/uploads\/2020\/06\/IMG_2859a.jpg\",\"datePublished\":\"2020-06-18T04:48:21+00:00\",\"dateModified\":\"2021-03-10T03:15:58+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/mascotengineering.com\/case-study\/central-station-psu-upgrade\/#breadcrumb\"},\"inLanguage\":\"sg\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/mascotengineering.com\/case-study\/central-station-psu-upgrade\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sg\",\"@id\":\"https:\/\/mascotengineering.com\/case-study\/central-station-psu-upgrade\/#primaryimage\",\"url\":\"https:\/\/mascotengineering.com\/wp-content\/uploads\/2020\/06\/IMG_2859a.jpg\",\"contentUrl\":\"https:\/\/mascotengineering.com\/wp-content\/uploads\/2020\/06\/IMG_2859a.jpg\",\"width\":1000,\"height\":750,\"caption\":\"Concrete Pit\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/mascotengineering.com\/case-study\/central-station-psu-upgrade\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/mascotengineering.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Case Studies\",\"item\":\"https:\/\/mascotengineering.com\/case-studies\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Central Station PSU Upgrade\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/mascotengineering.com\/#website\",\"url\":\"https:\/\/mascotengineering.com\/\",\"name\":\"Mascot Engineering\",\"description\":\"Mascot Engineering specialises in the design and manufacture of castings in accordance with EN 124\",\"publisher\":{\"@id\":\"https:\/\/mascotengineering.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/mascotengineering.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sg\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/mascotengineering.com\/#organization\",\"name\":\"Mascot Engineering\",\"url\":\"https:\/\/mascotengineering.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sg\",\"@id\":\"https:\/\/mascotengineering.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/mascotengineering.com\/wp-content\/uploads\/2025\/06\/MascotEngineeing_Logo_BlackText_RGB.png\",\"contentUrl\":\"https:\/\/mascotengineering.com\/wp-content\/uploads\/2025\/06\/MascotEngineeing_Logo_BlackText_RGB.png\",\"width\":769,\"height\":671,\"caption\":\"Mascot Engineering\"},\"image\":{\"@id\":\"https:\/\/mascotengineering.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/MascotEngineering\",\"https:\/\/www.linkedin.com\/company\/mascot-engineering\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Central Station PSU Upgrade | Mascot Engineering","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mascotengineering.com\/sg\/case-study\/central-station-psu-upgrade\/","og_locale":"en_US","og_type":"article","og_title":"Central Station PSU Upgrade | Mascot Engineering","og_description":"Measuring a huge 6m by 4m and just under 3m in depth, this large custom precast cable pit was quite a sight on the streets of the CBD. The custom concrete pit was manufactured to Novo Rail and Transport for NSW project specific requirements complete with retractable ladders for easy access and cast in drainage [&hellip;]","og_url":"https:\/\/mascotengineering.com\/sg\/case-study\/central-station-psu-upgrade\/","og_site_name":"Mascot Engineering","article_publisher":"https:\/\/www.facebook.com\/MascotEngineering","article_modified_time":"2021-03-10T03:15:58+00:00","og_image":[{"width":1000,"height":750,"url":"https:\/\/mascotengineering.com\/wp-content\/uploads\/2020\/06\/IMG_2859a.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/mascotengineering.com\/case-study\/central-station-psu-upgrade\/","url":"https:\/\/mascotengineering.com\/case-study\/central-station-psu-upgrade\/","name":"Central Station PSU Upgrade | Mascot Engineering","isPartOf":{"@id":"https:\/\/mascotengineering.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/mascotengineering.com\/case-study\/central-station-psu-upgrade\/#primaryimage"},"image":{"@id":"https:\/\/mascotengineering.com\/case-study\/central-station-psu-upgrade\/#primaryimage"},"thumbnailUrl":"https:\/\/mascotengineering.com\/wp-content\/uploads\/2020\/06\/IMG_2859a.jpg","datePublished":"2020-06-18T04:48:21+00:00","dateModified":"2021-03-10T03:15:58+00:00","breadcrumb":{"@id":"https:\/\/mascotengineering.com\/case-study\/central-station-psu-upgrade\/#breadcrumb"},"inLanguage":"sg","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mascotengineering.com\/case-study\/central-station-psu-upgrade\/"]}]},{"@type":"ImageObject","inLanguage":"sg","@id":"https:\/\/mascotengineering.com\/case-study\/central-station-psu-upgrade\/#primaryimage","url":"https:\/\/mascotengineering.com\/wp-content\/uploads\/2020\/06\/IMG_2859a.jpg","contentUrl":"https:\/\/mascotengineering.com\/wp-content\/uploads\/2020\/06\/IMG_2859a.jpg","width":1000,"height":750,"caption":"Concrete Pit"},{"@type":"BreadcrumbList","@id":"https:\/\/mascotengineering.com\/case-study\/central-station-psu-upgrade\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/mascotengineering.com\/"},{"@type":"ListItem","position":2,"name":"Case Studies","item":"https:\/\/mascotengineering.com\/case-studies\/"},{"@type":"ListItem","position":3,"name":"Central Station PSU Upgrade"}]},{"@type":"WebSite","@id":"https:\/\/mascotengineering.com\/#website","url":"https:\/\/mascotengineering.com\/","name":"Mascot Engineering","description":"Mascot Engineering specialises in the design and manufacture of castings in accordance with EN 124","publisher":{"@id":"https:\/\/mascotengineering.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mascotengineering.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sg"},{"@type":"Organization","@id":"https:\/\/mascotengineering.com\/#organization","name":"Mascot Engineering","url":"https:\/\/mascotengineering.com\/","logo":{"@type":"ImageObject","inLanguage":"sg","@id":"https:\/\/mascotengineering.com\/#\/schema\/logo\/image\/","url":"https:\/\/mascotengineering.com\/wp-content\/uploads\/2025\/06\/MascotEngineeing_Logo_BlackText_RGB.png","contentUrl":"https:\/\/mascotengineering.com\/wp-content\/uploads\/2025\/06\/MascotEngineeing_Logo_BlackText_RGB.png","width":769,"height":671,"caption":"Mascot Engineering"},"image":{"@id":"https:\/\/mascotengineering.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/MascotEngineering","https:\/\/www.linkedin.com\/company\/mascot-engineering"]}]}},"_links":{"self":[{"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/case_study\/7517","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/case_study"}],"about":[{"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/types\/case_study"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/media\/7520"}],"wp:attachment":[{"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/media?parent=7517"}],"wp:term":[{"taxonomy":"sector","embeddable":true,"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/sector?post=7517"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/product?post=7517"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}