{"id":8595,"date":"2020-08-24T09:48:51","date_gmt":"2020-08-23T23:48:51","guid":{"rendered":"http:\/\/mascotengineering.com\/?post_type=case_study&#038;p=8595"},"modified":"2021-07-15T09:59:39","modified_gmt":"2021-07-14T23:59:39","slug":"mareeba-wwtp","status":"publish","type":"case_study","link":"https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/","title":{"rendered":"Mareeba Wastewater Treatment Plant (WWTP)"},"content":{"rendered":"<p>Cable Pits &amp; Lids for Water Infrastructure<\/p>\n<p>The Far North Queensland regional town of Mareeba has seen a significant increase in population in recent years\u2026 so much so that the existing wastewater treatment plant was overloaded. The upgrade of the Mareeba WWTP project was a critical infrastructure project aimed to deliver a reliable utility service that mitigates environmental health. The environmental benefits are not only to the town, but to the receiving waters of Two Mile Creek whilst the bio-solids will be used as fertiliser by local farmers on sugar cane, avocados, bananas, mangoes, lychees and cropping pastures.<\/p>\n<p>So many good news stories from this single Water Treatment Plant. A growing Australian town that is assisting Australian farmers and growers while benefiting the Australian environment, and that the product used from Mascot Engineering is also manufactured here in Australia.<\/p>\n<p>Mascot GRC Cable Pits where chosen and installed by a local electrical contractor on the project. The lightweight concrete pits and Class C Checkerplate Covers (both manufactured here in Australia) where supplied from stock in our Brisbane warehouse via cost effective transport to Far North Queensland.<\/p>\n<p>Video:<br \/>\n<iframe loading=\"lazy\" title=\"Mareeba Wastewater Treatment Plant Upgrade | Building our Regions project\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/fnxwzalNuAE?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>","protected":false},"excerpt":{"rendered":"<p>Cable Pits &amp; Lids for Water Infrastructure The Far North Queensland regional town of Mareeba has seen a significant increase in population in recent years\u2026 so much so that the existing wastewater treatment plant was overloaded. The upgrade of the Mareeba WWTP project was a critical infrastructure project aimed to deliver a reliable utility service [&hellip;]<\/p>","protected":false},"featured_media":8599,"template":"","sector":[48,51],"product":[66,59],"class_list":["post-8595","case_study","type-case_study","status-publish","has-post-thumbnail","hentry","sector-electrical-communications","sector-water-infrastructure","product-access-covers","product-cable-pits"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Mareeba Wastewater Treatment Plant (WWTP) | Mascot Engineering<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Mareeba Wastewater Treatment Plant (WWTP) | Mascot Engineering\" \/>\n<meta property=\"og:description\" content=\"Cable Pits &amp; Lids for Water Infrastructure The Far North Queensland regional town of Mareeba has seen a significant increase in population in recent years\u2026 so much so that the existing wastewater treatment plant was overloaded. The upgrade of the Mareeba WWTP project was a critical infrastructure project aimed to deliver a reliable utility service [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/\" \/>\n<meta property=\"og:site_name\" content=\"Mascot Engineering\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/MascotEngineering\" \/>\n<meta property=\"article:modified_time\" content=\"2021-07-14T23:59:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mascotengineering.com\/wp-content\/uploads\/2020\/08\/WWTP3.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/\",\"url\":\"https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/\",\"name\":\"Mareeba Wastewater Treatment Plant (WWTP) | Mascot Engineering\",\"isPartOf\":{\"@id\":\"https:\/\/mascotengineering.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/mascotengineering.com\/wp-content\/uploads\/2020\/08\/WWTP3.jpg\",\"datePublished\":\"2020-08-23T23:48:51+00:00\",\"dateModified\":\"2021-07-14T23:59:39+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/#breadcrumb\"},\"inLanguage\":\"sg\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sg\",\"@id\":\"https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/#primaryimage\",\"url\":\"https:\/\/mascotengineering.com\/wp-content\/uploads\/2020\/08\/WWTP3.jpg\",\"contentUrl\":\"https:\/\/mascotengineering.com\/wp-content\/uploads\/2020\/08\/WWTP3.jpg\",\"width\":800,\"height\":600,\"caption\":\"Electrical Cable Pits\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/mascotengineering.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Case Studies\",\"item\":\"https:\/\/mascotengineering.com\/case-studies\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Mareeba Wastewater Treatment Plant (WWTP)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/mascotengineering.com\/#website\",\"url\":\"https:\/\/mascotengineering.com\/\",\"name\":\"Mascot Engineering\",\"description\":\"Mascot Engineering specialises in the design and manufacture of castings in accordance with EN 124\",\"publisher\":{\"@id\":\"https:\/\/mascotengineering.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/mascotengineering.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sg\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/mascotengineering.com\/#organization\",\"name\":\"Mascot Engineering\",\"url\":\"https:\/\/mascotengineering.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sg\",\"@id\":\"https:\/\/mascotengineering.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/mascotengineering.com\/wp-content\/uploads\/2025\/06\/MascotEngineeing_Logo_BlackText_RGB.png\",\"contentUrl\":\"https:\/\/mascotengineering.com\/wp-content\/uploads\/2025\/06\/MascotEngineeing_Logo_BlackText_RGB.png\",\"width\":769,\"height\":671,\"caption\":\"Mascot Engineering\"},\"image\":{\"@id\":\"https:\/\/mascotengineering.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/MascotEngineering\",\"https:\/\/www.linkedin.com\/company\/mascot-engineering\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Mareeba Wastewater Treatment Plant (WWTP) | Mascot Engineering","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/","og_locale":"en_US","og_type":"article","og_title":"Mareeba Wastewater Treatment Plant (WWTP) | Mascot Engineering","og_description":"Cable Pits &amp; Lids for Water Infrastructure The Far North Queensland regional town of Mareeba has seen a significant increase in population in recent years\u2026 so much so that the existing wastewater treatment plant was overloaded. The upgrade of the Mareeba WWTP project was a critical infrastructure project aimed to deliver a reliable utility service [&hellip;]","og_url":"https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/","og_site_name":"Mascot Engineering","article_publisher":"https:\/\/www.facebook.com\/MascotEngineering","article_modified_time":"2021-07-14T23:59:39+00:00","og_image":[{"width":800,"height":600,"url":"https:\/\/mascotengineering.com\/wp-content\/uploads\/2020\/08\/WWTP3.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/","url":"https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/","name":"Mareeba Wastewater Treatment Plant (WWTP) | Mascot Engineering","isPartOf":{"@id":"https:\/\/mascotengineering.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/#primaryimage"},"image":{"@id":"https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/#primaryimage"},"thumbnailUrl":"https:\/\/mascotengineering.com\/wp-content\/uploads\/2020\/08\/WWTP3.jpg","datePublished":"2020-08-23T23:48:51+00:00","dateModified":"2021-07-14T23:59:39+00:00","breadcrumb":{"@id":"https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/#breadcrumb"},"inLanguage":"sg","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/"]}]},{"@type":"ImageObject","inLanguage":"sg","@id":"https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/#primaryimage","url":"https:\/\/mascotengineering.com\/wp-content\/uploads\/2020\/08\/WWTP3.jpg","contentUrl":"https:\/\/mascotengineering.com\/wp-content\/uploads\/2020\/08\/WWTP3.jpg","width":800,"height":600,"caption":"Electrical Cable Pits"},{"@type":"BreadcrumbList","@id":"https:\/\/mascotengineering.com\/sg\/case-study\/mareeba-wwtp\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/mascotengineering.com\/"},{"@type":"ListItem","position":2,"name":"Case Studies","item":"https:\/\/mascotengineering.com\/case-studies\/"},{"@type":"ListItem","position":3,"name":"Mareeba Wastewater Treatment Plant (WWTP)"}]},{"@type":"WebSite","@id":"https:\/\/mascotengineering.com\/#website","url":"https:\/\/mascotengineering.com\/","name":"Mascot Engineering","description":"Mascot Engineering specialises in the design and manufacture of castings in accordance with EN 124","publisher":{"@id":"https:\/\/mascotengineering.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mascotengineering.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sg"},{"@type":"Organization","@id":"https:\/\/mascotengineering.com\/#organization","name":"Mascot Engineering","url":"https:\/\/mascotengineering.com\/","logo":{"@type":"ImageObject","inLanguage":"sg","@id":"https:\/\/mascotengineering.com\/#\/schema\/logo\/image\/","url":"https:\/\/mascotengineering.com\/wp-content\/uploads\/2025\/06\/MascotEngineeing_Logo_BlackText_RGB.png","contentUrl":"https:\/\/mascotengineering.com\/wp-content\/uploads\/2025\/06\/MascotEngineeing_Logo_BlackText_RGB.png","width":769,"height":671,"caption":"Mascot Engineering"},"image":{"@id":"https:\/\/mascotengineering.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/MascotEngineering","https:\/\/www.linkedin.com\/company\/mascot-engineering"]}]}},"_links":{"self":[{"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/case_study\/8595","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/case_study"}],"about":[{"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/types\/case_study"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/media\/8599"}],"wp:attachment":[{"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/media?parent=8595"}],"wp:term":[{"taxonomy":"sector","embeddable":true,"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/sector?post=8595"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/product?post=8595"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}