{"id":8734,"date":"2021-03-24T13:57:57","date_gmt":"2021-03-24T02:57:57","guid":{"rendered":"http:\/\/mascotengineering.com\/?post_type=case_study&#038;p=8734"},"modified":"2021-03-24T14:00:35","modified_gmt":"2021-03-24T03:00:35","slug":"level-crossing-removal-project-vic","status":"publish","type":"case_study","link":"https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/","title":{"rendered":"Level Crossing Removal Project Vic"},"content":{"rendered":"<p>Vic State Government has major project in progress to remove 75 x Rail Level Crossings \u2013 Either roads built over rail or rail over road (Sky Rail) with 46 crossing removals completed to date.<\/p>\n<p>The Level Crossing Removal Project (LXRP) due for completion in 2025 is one of Victoria&#8217;s key infrastructure projects; and is designed to improve safety, improve travel time and increase the capacity of Melbourne&#8217;s train network.<\/p>\n<p>Mascot Engineering is currently working with several civil contractors to supply a range of <a href=\"http:\/\/mascotengineering.com\/sg\/products\/cable-pits\/cable-pit-sizes\/\">GRC Cable Pit<\/a> and cover solutions in various load ratings to the extensive project. Mascot GRC products are Victrack approved and were specified on projects including \u00a0Deer Park, St Albans, \u00a0Reservoir, Mernda, South Morang, Hughesdale, Gardiner, Noble Park, Cheltenham, Carrum, Carnegie, Murrumbeena, Oakleigh, Mitcham, Lilydale, Mooroolbark, Caulfield and Bayswater.<\/p>\n<p>Mascot Engineering&#8217;s GRC pit solutions are engineered for installations requiring a load rating to Class G, and are cost effective and easy to install. For more information on how Mascot Engineering support key infrastructure projects involving electrical solutions throughout Australia, <a href=\"http:\/\/mascotengineering.com\/sg\/industries\/electrical-and-communications\/\">click here<\/a>.<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Vic State Government has major project in progress to remove 75 x Rail Level Crossings \u2013 Either roads built over rail or rail over road (Sky Rail) with 46 crossing removals completed to date. The Level Crossing Removal Project (LXRP) due for completion in 2025 is one of Victoria&#8217;s key infrastructure projects; and is designed [&hellip;]<\/p>","protected":false},"featured_media":9423,"template":"","sector":[49,48],"product":[66,59],"class_list":["post-8734","case_study","type-case_study","status-publish","has-post-thumbnail","hentry","sector-civil-infrastructure","sector-electrical-communications","product-access-covers","product-cable-pits"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Level Crossing Removal Project Vic | Mascot Engineering<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Level Crossing Removal Project Vic | Mascot Engineering\" \/>\n<meta property=\"og:description\" content=\"Vic State Government has major project in progress to remove 75 x Rail Level Crossings \u2013 Either roads built over rail or rail over road (Sky Rail) with 46 crossing removals completed to date. The Level Crossing Removal Project (LXRP) due for completion in 2025 is one of Victoria&#8217;s key infrastructure projects; and is designed [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/\" \/>\n<meta property=\"og:site_name\" content=\"Mascot Engineering\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/MascotEngineering\" \/>\n<meta property=\"article:modified_time\" content=\"2021-03-24T03:00:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/mascotengineering.com\/wp-content\/uploads\/2021\/03\/KCR-project-resized-final.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"945\" \/>\n\t<meta property=\"og:image:height\" content=\"668\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/\",\"url\":\"https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/\",\"name\":\"Level Crossing Removal Project Vic | Mascot Engineering\",\"isPartOf\":{\"@id\":\"https:\/\/mascotengineering.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/mascotengineering.com\/wp-content\/uploads\/2021\/03\/KCR-project-resized-final.jpg\",\"datePublished\":\"2021-03-24T02:57:57+00:00\",\"dateModified\":\"2021-03-24T03:00:35+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/#breadcrumb\"},\"inLanguage\":\"sg\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"sg\",\"@id\":\"https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/#primaryimage\",\"url\":\"https:\/\/mascotengineering.com\/wp-content\/uploads\/2021\/03\/KCR-project-resized-final.jpg\",\"contentUrl\":\"https:\/\/mascotengineering.com\/wp-content\/uploads\/2021\/03\/KCR-project-resized-final.jpg\",\"width\":945,\"height\":668},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/mascotengineering.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Case Studies\",\"item\":\"https:\/\/mascotengineering.com\/case-studies\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Level Crossing Removal Project Vic\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/mascotengineering.com\/#website\",\"url\":\"https:\/\/mascotengineering.com\/\",\"name\":\"Mascot Engineering\",\"description\":\"Mascot Engineering specialises in the design and manufacture of castings in accordance with EN 124\",\"publisher\":{\"@id\":\"https:\/\/mascotengineering.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/mascotengineering.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"sg\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/mascotengineering.com\/#organization\",\"name\":\"Mascot Engineering\",\"url\":\"https:\/\/mascotengineering.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"sg\",\"@id\":\"https:\/\/mascotengineering.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/mascotengineering.com\/wp-content\/uploads\/2025\/06\/MascotEngineeing_Logo_BlackText_RGB.png\",\"contentUrl\":\"https:\/\/mascotengineering.com\/wp-content\/uploads\/2025\/06\/MascotEngineeing_Logo_BlackText_RGB.png\",\"width\":769,\"height\":671,\"caption\":\"Mascot Engineering\"},\"image\":{\"@id\":\"https:\/\/mascotengineering.com\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/MascotEngineering\",\"https:\/\/www.linkedin.com\/company\/mascot-engineering\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Level Crossing Removal Project Vic | Mascot Engineering","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/","og_locale":"en_US","og_type":"article","og_title":"Level Crossing Removal Project Vic | Mascot Engineering","og_description":"Vic State Government has major project in progress to remove 75 x Rail Level Crossings \u2013 Either roads built over rail or rail over road (Sky Rail) with 46 crossing removals completed to date. The Level Crossing Removal Project (LXRP) due for completion in 2025 is one of Victoria&#8217;s key infrastructure projects; and is designed [&hellip;]","og_url":"https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/","og_site_name":"Mascot Engineering","article_publisher":"https:\/\/www.facebook.com\/MascotEngineering","article_modified_time":"2021-03-24T03:00:35+00:00","og_image":[{"width":945,"height":668,"url":"https:\/\/mascotengineering.com\/wp-content\/uploads\/2021\/03\/KCR-project-resized-final.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/","url":"https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/","name":"Level Crossing Removal Project Vic | Mascot Engineering","isPartOf":{"@id":"https:\/\/mascotengineering.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/#primaryimage"},"image":{"@id":"https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/#primaryimage"},"thumbnailUrl":"https:\/\/mascotengineering.com\/wp-content\/uploads\/2021\/03\/KCR-project-resized-final.jpg","datePublished":"2021-03-24T02:57:57+00:00","dateModified":"2021-03-24T03:00:35+00:00","breadcrumb":{"@id":"https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/#breadcrumb"},"inLanguage":"sg","potentialAction":[{"@type":"ReadAction","target":["https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/"]}]},{"@type":"ImageObject","inLanguage":"sg","@id":"https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/#primaryimage","url":"https:\/\/mascotengineering.com\/wp-content\/uploads\/2021\/03\/KCR-project-resized-final.jpg","contentUrl":"https:\/\/mascotengineering.com\/wp-content\/uploads\/2021\/03\/KCR-project-resized-final.jpg","width":945,"height":668},{"@type":"BreadcrumbList","@id":"https:\/\/mascotengineering.com\/sg\/case-study\/level-crossing-removal-project-vic\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/mascotengineering.com\/"},{"@type":"ListItem","position":2,"name":"Case Studies","item":"https:\/\/mascotengineering.com\/case-studies\/"},{"@type":"ListItem","position":3,"name":"Level Crossing Removal Project Vic"}]},{"@type":"WebSite","@id":"https:\/\/mascotengineering.com\/#website","url":"https:\/\/mascotengineering.com\/","name":"Mascot Engineering","description":"Mascot Engineering specialises in the design and manufacture of castings in accordance with EN 124","publisher":{"@id":"https:\/\/mascotengineering.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/mascotengineering.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"sg"},{"@type":"Organization","@id":"https:\/\/mascotengineering.com\/#organization","name":"Mascot Engineering","url":"https:\/\/mascotengineering.com\/","logo":{"@type":"ImageObject","inLanguage":"sg","@id":"https:\/\/mascotengineering.com\/#\/schema\/logo\/image\/","url":"https:\/\/mascotengineering.com\/wp-content\/uploads\/2025\/06\/MascotEngineeing_Logo_BlackText_RGB.png","contentUrl":"https:\/\/mascotengineering.com\/wp-content\/uploads\/2025\/06\/MascotEngineeing_Logo_BlackText_RGB.png","width":769,"height":671,"caption":"Mascot Engineering"},"image":{"@id":"https:\/\/mascotengineering.com\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/MascotEngineering","https:\/\/www.linkedin.com\/company\/mascot-engineering"]}]}},"_links":{"self":[{"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/case_study\/8734","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/case_study"}],"about":[{"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/types\/case_study"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/media\/9423"}],"wp:attachment":[{"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/media?parent=8734"}],"wp:term":[{"taxonomy":"sector","embeddable":true,"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/sector?post=8734"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/mascotengineering.com\/sg\/wp-json\/wp\/v2\/product?post=8734"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}